31 C
State of Tripura
Tuesday, March 17, 2026

Tripura Finance Minister presents Rs 34,212.31 Cr Budget for FY 2026–27

Tripura Budget 2026–27 worth ₹34,212 crore presented...

Tripura CM Dr. Saha Launches 24 Advanced Emergency Ambulances

Tripura Chief Minister Manik Saha flags off...

BJP Targets All 28 Seats in Tripura ADC Elections: CM Saha

Tripura Chief Minister Manik Saha declares BJP’s...

DMRC Completes Key Tunnel on Tughlakabad-Aerocity Golden Line Corridor –

Must Read

The Delhi Metro Rail Corporation (DMRC) today completed the construction of an underground tunnel between Maa Anandmayee Marg and Tughlakabad Railway colony station on the Tughlakabad-Aerocity corridor of Phase-IV, which is also known as the Golden Line.
 

The breakthrough of the Tunnel Boring Machine took place in the presence of the Minister for Transport of the NCT of Delhi, Dr. Pankaj Kumar Singh. Managing Director of DMRC and other senior officials were also present. This new tunnel has been constructed at an average depth of approximately 18 meters. About 566 rings have been installed in the tunnel, with an inner diameter of 5.8 meters.

- Advertisement -
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img
spot_img

Latest News

Indian Markets Trade Higher: Sensex Up 178 Points, Nifty Gains 54 Points

Benchmark domestic equity indices were trading over 0.2 per cent up in afternoon trade today. The Sensex...