30.5 C
State of Tripura
Tuesday, July 29, 2025

Biplab Deb secures Railway Ministry’s support for Agartala-Haridwar train

The Railway Ministry has begun feasibility studies...

Nine BJP workers injured in attack during Mann Ki Baat in Tripura

At least nine BJP workers were injured...

New Cricket ground coming up in Sabroom: Tripura CM

Tripura CM Manik Saha announces a new...

NFR removes permanent speed restriction To improve speed and safety

Tripura Net
Tripura Net
www.tripuranet.com is a daily news, news article, feature, public opinion, articles, photographs, videos etc –all in digital format- based website meant to disseminate unbiased information as far possible as accurate.

Must Read

The Northeast Frontier Railway (NFR) is taking various measures to increase sectional speed of trains. In this regard, temporary and permanent speed restrictions are being removed wherever feasible. Moreover, speeds of train movement through loop lines have also been increased in various sections. This has resulted in the overall increase in speed of trains apart from improvement in punctuality and to offer enhanced train services to passengers.           

NFR has removed/relaxed 10 Permanent Speed Restrictions (PSRs) up to the month of December, 2024. To remove the Permanent Speed Restriction, the curve has been smoothened by adjusting the track geometry, reducing the curvature and allowing for faster train speeds through those sections. Additionally, the bridges have been leveled to ensure that the tracks are flat and do not have any abrupt changes in gradient. The removal of this PSR is a testament to the hard work and dedication of the engineering team of NFR.

Similarly, 44 nos. Temporary Speed Restrictions (TSRs) exist over NFR as of now. The speed enhancement work involves comprehensive upgrading of all infrastructures such as track renewal, strengthening of bridges, easing of curves wherever feasible, improving signalling system etc. 

NFR has been actively working to improve track conditions and remove PSRs throughout its network. These efforts have included track renewal, track maintenance, and the installation of advanced signaling and control systems. The removal of this permanent speed restriction is just one example of the NFR commitment to providing safe and efficient rail travel for all. PRESS RELEASE

- Advertisement -
spot_img
spot_img
spot_img

Latest News

Iran warns of decisive response if US, Israel attack again amid rising nuclear tensions

Iran’s Foreign Minister has warned that his country would respond to the United States and Israel more...